TVA 26a permitted open boathouse with metal roof built by Blue Horizon Docks and Decks
TVA 26a Permits

TVA 26a dock permits — handled end-to-end.

We file a permit on every project that requires one. From the application through every TVA review and back-and-forth, we handle the entire process — you don’t break ground until the approval is in hand.

TVA 26a

What “26a” actually means.

Section 26a of the TVA Act gives the Tennessee Valley Authority approval authority over any structure built across, along, or in the waters of TVA-managed reservoirs — that includes every fixed dock, floating dock, boathouse, boat lift, mooring buoy, and shoreline modification on the lakes we work.

Without an approved 26a permit, building a dock is a violation. With one, you’re legal, insurable, and protected against future removal orders. We file the permit on every project that requires one, included at no extra charge.

Waiting on TVA can be difficult, but we make it easy. Any questions at all — give us a call.

Filed · Approved · On Time
Blue Horizon's TVA Section 26a joint permit application form (Department of the Army / TVA)
Scope

If it touches the water, it probably needs a 26a.

TVA’s 26a authority is broader than people expect. The most common projects we permit:

01

New Fixed Docks

Every new pile-mounted dock, boathouse, or slip structure built on a TVA reservoir. Permit covers the dock plus any integrated lift.

02

New Floating Docks

All floating dock systems on TVA waters — aluminum and wood frame, single and multi-section. Anchoring system is part of the application.

03

Boat & PWC Lifts

Lifts being added to existing permitted docks usually fall under the existing permit. New lifts on new docks are part of the 26a submission.

04

Dock Renovations

Adding slips, changing footprint, adding a second story, or other significant structural changes may require a new 26a review. Any addition to an existing dock requires a permit.

05

Shoreline Modifications

Retaining walls, riprap, beach fill, or any structure within TVA’s lakeward jurisdiction. Often paired with a dock build.

06

Roane County

Roane County has special local requirements on top of TVA 26a review — we handle both filings as part of the project.

Process

Four steps. Mostly hands-off for you.

We do every step. Your only job is to sign the application and the build contract.

01

Site Visit & Survey

We walk the shoreline, take depth readings, photo the existing site, and map setbacks to property lines and neighbor docks.

02

Application Package

Drawings, site map, project description, supporting photos — plus a stamped engineer drawing if your project needs one — packaged to TVA’s spec. You review and sign once.

03

TVA Review

TVA assigns a reviewer, may request a site visit of their own, and asks for clarifications. We respond to all of it. Most docks land in 3–6 weeks.

04

Approval & Build

26a approval lands. We mobilize the build, finish in 3–5 weeks for most docks, and handle any post-build inspection.

TVA 26a approved finished dock build in a sheltered Tennessee lake cove
Included

We handle the permit process for full dock builds.

On every full dock build we sign, we handle the entire process of filing and managing the permit — the application fee, the drawings, the TVA back-and-forth, all of it. It’s baked into the price of the build, not added on top.

  • Application fee — bundled into the project, not billed separately.
  • Site survey and shoreline photos — we visit the property and take what TVA needs.
  • Permit-ready drawings — plan view, elevation, site map, all to TVA spec.
  • Stamped engineer drawing — included when the project requires it.
  • Project description and narrative — written and submitted as part of the application.
  • All correspondence with TVA — review questions, supplemental requests, scheduling.
  • Lake-specific compliance — setbacks, height limits, slip count caps — all checked before submission. Roane County properties get the extra county filing too.
  • Post-approval recordkeeping — you get the approved permit packet for your files and future insurance claims.

We handle the permit. You get the dock.

The permit step is included in every Blue Horizon full-build project. No surprise paperwork bills, no “permit fee charged separately.”

FAQ

TVA 26a permit questions.

How long does TVA take to approve a 26a permit?

Most straightforward applications come back in 3–6 weeks once everything is in TVA’s hands. Waiting on TVA can be difficult, but we make it easy — we submit as early in the process as possible so the build can land in spring or early summer.

Do I need a 26a permit if I’m just replacing an existing dock?

Almost always, yes — especially if the footprint or structure changes. If you’re swapping decking on an existing permitted dock with no structural change, you may not, but we’ll confirm before assuming.

What if my neighbors object?

TVA notifies adjacent landowners as part of the review. Objections are heard but rarely block a properly-spec’d permit. We design to setbacks and standards specifically to avoid issues at this stage.

Are private lakes covered by 26a?

No — Section 26a is TVA-specific. Private lakes have their own rules (often through the HOA or landowner association), which we’ll check at site visit. Private lakes generally permit much faster than TVA reservoirs.

What if I already started construction without a permit?

Stop building and call us. TVA can require removal of unpermitted structures. We can usually file a retroactive permit and bring the build into compliance, but the path is harder than starting fresh.

Do I need separate permits for a dock and a boat lift?

If we build the dock and install the lift together, they go on one 26a permit. Lifts being added to existing permitted docks usually don’t require a new permit.

Start a Project

Let us file the 26a.

One phone call kicks off the site visit. From there we handle TVA from end to end — you sign once, we file, review, and break ground when the permit lands.

HoursMon – Fri: 8:00 AM – 5:00 PM
The Blue Horizon Docks and Decks team

Permit & Project Inquiry

We’ll reach out within one business day.

We reply within 1 business day.